Chockfast Black was used to carry the full weight and the clamping force of the total foundation bolt tension of an MAN 7K60 MC bio fuel engine installed at Beckton in East London.
Chockfast Orange was used extensively to create a good fit between various items of equipment installed on the trusses of the Wimbledon Centre Court closing roof.
A very prestigious and demanding application for Chockfast was on the Thames Flood Barrier at Woolwich. Welding distortion of the gates prevented achievement of the designed for steel to steel fit on both the fixed and hinged connections to the gate arms.
An international American oil company concerned with excessive vibration on three of their gas compressors installed in a desert oil field. These machines were visibly shaking to such an extent that pipes were fracturing and the machines were shutting down.