FAQ's

+44 (0)1202 632868

Contact Us

Frequently Asked Questions

What temperature / cure time is recommended for the Chockfast?

Chockfast ® Orange

Cure Time
Temperature
48 hours
15°C (60°F)
36 hours
18 °C (65°F)
24 hours
21°C (70°F)
18 hours
26°C (80°F)

Chockfast ® Black

Cure Time
Temperature
48 hours
15°C (60°F)
36 hours
18 °C (65°F)
24 hours
21°C (70°F)
18 hours
26°C (80°F)

Chockfast ® Gray

Cure Time
Temperature
24 hours
18°C (65°F)
18 hours
30°C (85°F)

Chockfast ® Red

Cure Time
Temperature
54 hours
16°C (60°F)
36 hours
21 °C (72°F)
24 hours
27°C (80°F)
18 hours
32°C (90°F)

Chockfast ® Red SG

Cure Time
Temperature
24 to 48 hours
21°C (70°F)

What type of surface preparation is required?

Must be a clean, dry, oil free, and sound concrete / steel surface.


What is the availability of the Chockfast?

Normally available ex stock, otherwise 10 to 15 working days from receipt of written order.


Can you assist with the selection of the most suitable product for our application?

Yes, on receipt of relevant foundation drawings and details of the machinery.


Can you provide an application service?

Yes we have fully trained technicians available to work in the UK and worldwide.


Do you have COSHH Data Sheets?

Yes, please refer to our website under products, where you will see buttons enablining you to download Safety Data Shhets (SDS) and Technical Data Sheets (TDS).


Can you provide Certificates of Origin and Conformance?

Yes, on request.